please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
Answer Posted / dilip wasudeo jadhao
Site Engineer-supervising to the worker working on site and
guide them for proper execution.
Quantity surveyor- Estimate the quantity of the work under
execution.
Quality control engineer- To carry out different test of
material used for the construction and by which control the
quality of work.
Planning engineer- To plan the different activities
according to time limit and execute the work in schedule and
also see whether execution on site going properly within
time limit, accordingly appoint the worker and give material
requirement.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how to disign cuplock shuttering and it's matireal requirement snd any related web site
what is the use of water bar in water tank and is this an extra item in estimate?
what is conrete grade ,how are depent on concrete grad and size of concrete?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
Explain different types of rcc pipes.
indian standard split spoon sampler
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
specifications of fe500 steel
how to calculate rate analysys of 1:6 plastering 10 sq m
as per is code, what is the minimum content of opc and ppc cement for rcc structure
60-70 grade of Bitumen is VG-30 ?
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
what are RIB slabs explain about it
List out some of the checking’s, done at the completion of construction?