Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer

Answer Posted / dilip wasudeo jadhao

Site Engineer-supervising to the worker working on site and
guide them for proper execution.

Quantity surveyor- Estimate the quantity of the work under
execution.

Quality control engineer- To carry out different test of
material used for the construction and by which control the
quality of work.

Planning engineer- To plan the different activities
according to time limit and execute the work in schedule and
also see whether execution on site going properly within
time limit, accordingly appoint the worker and give material
requirement.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?

2187


a butt weld is specified by

3086


how many spacers we need for 1 ton reinforcement? aprox.

5508


20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u

2410


what are RIB slabs explain about it

2680


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

5166


How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

2235


How to compute minimum number of columns required for a site from area of site?

2127


how to calculate number of bitumen for road asphalt

1593


how to calculate valuation for the old building?

2468


Differentiate first angle & third angle projection?

1184


Trapezoidal section footing calculation of Volume & its Area

36493


What are the applications of modulus of elasticity?

1469


What is the Unit weight of coarse sand (F.M- 2.20) ?????

2014


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2133