why insulation cost is more in underground cable than in overhead line?..

Answer / biren

In overhead line there is air around the bare conductor which is a insulation layer but the earth around the under ground cable is a good conductor. so there is more chance of insulation failure, hence to avoid the normal insulation failure more insulation is provided which increases the cost.

Is This Answer Correct ?    2 Yes 0 No

why insulation cost is more in underground cable than in overhead line?..

Answer / sk.azhar.m

An underground line is fill in the earth and when if the leakage current will flo in the erth the current rating will very high in the cable that is very dangerous for human and other and in the the overhead line the air is not good conductor of electricity while an underground line is more insulation than overhead line for this reason the insulation cost is more in underground system

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Convert a star connected network into a delta connected network.

1 Answers   Syntel, Visa,


How to find the length of a Xlpe cable required to transmit 3mva load at 22kv.

1 Answers  


Which type of alternator used in power station?

2 Answers  


why we use negative feedback in control system.

2 Answers  


why surge suppressor in vaccum circuit breaker and it is only in motor feeder why not in tranformer feeder?no surge suppresor in ocb in motor feeder?

1 Answers   IOCL,


Why two main buses and one transfer bus scheme not using for 400kV switchyard

5 Answers  


dc supply given to dc generator winding.how is possible? my knowledge is saying the winding will burn. please reply.

1 Answers  


what is droop?

13 Answers   Alstom, Bhel,


Which one is correct mVA or MVA. Whether both the units are same for the transformer

10 Answers   Areva,


A genarator is connected through a 20MVA ,13.8/138 KV stepdown transformer to a transmission line. at the reciving end of the line a load is supplied through a step down transformer of 10MVA,138/69 KV rating .A 0.72 PU load evaluated on load side transformer ratings as base values ,is supplied from the above system for system base values of 10 MVA and 69 KV in load circuit the value of the load in generator circuit will be ...........

1 Answers  


What is meant by electrical speed?

1 Answers  


how can tell us the AC indoor or outdoor which Tr and formulls

1 Answers   Mukand,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)