Answer / debasis sahoo
During installation of Transformer on a Pole mounting structure, following checks should be made:
Ensure that the base channel of transformer is at height complying to IEC Standards:
a) Height of top of HV bushing from ground for pole mounted transformer should be 4.572 meters minimum (15 Ft)
b) Height of top of HV bushing from ground for plinth mounted transformer should be 2.75 meters minimum (8 Ft)
Ensure that base channel is horizontally leveled
Avoid jerky movement of the transformer while lifting it upwards during installation
During installation ensure that the HV bushings of the transformer are on the DO unit (or HG fuse unit) side of the structure
After installation of transformer, also check that other allied equipments such as AB switch, Horn Gap fuse units, DO Fuse sets, Lightening arrestor etc. are fitted at appropriate positions as per the applicable drawing issued by the utility.
Use PVC unarmoured cable (3 ½ core) of appropriate size and length for LV side. Ensure that the lugs are appropriately crimped at the ends.
Is This Answer Correct ? | 2 Yes | 0 No |
In 110V DC supply,if a closed circuit gets open, How can we identify the voltage which is measured after the resistor(4KOhm) which is open with negative.it shows 55V +ve when measured, also the actual positive source is 55V +ve .Because there is no voltage drop in open circuit. How can we identify whether this is the voltage which is series with the resistor or the DC source direct +ve.
What is the difference between power,voltage,current? and with example
What is the meaning of BREAKING and MAKING CAPACITY in case of CIRCUIT BREAKERS.
what will happen if dc machine are supplied by ac source??
Do you know the faults occurs generally in motors and how to rectify them?
how to calclate fault level
What is the name of process In VFD frequency are increase then voltage increase & frequency decrease then voltage decrease?
% voltage variation in distribution a)1% b)5% c)10% d)15%
what is relation between vector group of transformer and its load hormonics?
what is the difference between isolation and insolation ? please explain in detail with example.
how do you tell if a avalanche button diode is a p or an
i completed my DEEE. and i want to electrical c license. how to get it..?