Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Is it possible to import & export power through the same power transformer? what will be the vector group normally for both different or same?



Is it possible to import & export power through the same power transformer? what will be the vec..

Answer / k.prakashchandra

Yes.As the vector group was considered during
commissioning,the same will hold good.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

why battery is connected in series?

10 Answers   HP,


how does a liquid starter reduce the starting currents?

0 Answers  


What is the difference between Generator Differential Relay and Transformer Differential Relay?

0 Answers  


How to know the back up time for a 5KVA UPS which is connected to 15 nos. of computers? Is there any formula for this? pls. tell me.

1 Answers   HAL,


What happen if you keep open the Neutral Grounding Switch in open condition of the HT Generator at starting and again on load if it open then?

1 Answers  


what would happen when synchronous motor will operate beyond syncronous speed?

3 Answers  


what is meant by peak load

2 Answers  


Why Lead-Acid cell voltage is 2.1 volt, why we can not chenged it cell voltage by using extra row-material, only incries its AH.

1 Answers  


List some examples of renewable energy?

0 Answers  


Why Trasformers rated in KVA

13 Answers   College School Exams Tests, HAL, Oil and Gas Jobs,


for a machine R=130 KVA Y=132 KVA B=144 KVA Then what will be the total kva

3 Answers   ABB,


what's transient & sub- transient reactance means?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)