How do I calculate the ground is resested for a 5 floor building?..

Answer / jr suthar

By calculating the total load of building and safe bearing
capacity of sub soil, We can find out that the sub soil is
capable to resist the load of 5 story building.

Is This Answer Correct ?    48 Yes 1 No

How do I calculate the ground is resested for a 5 floor building?..

Answer / p.govindarasu

i calculate the ground resisted for a five floor building
with of help of safe bearing capacity of soil

Is This Answer Correct ?    24 Yes 2 No

How do I calculate the ground is resested for a 5 floor building?..

Answer / samsul

by calculating the total superstructure load of the building
and the safe bearing capacity of the soil where the
foundation is laid down.more precisely adding (the column
weight - weight of the soil of column volume)

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance

2 Answers  


What is the basic difference between construction and infrastructure

1 Answers  


how to find soil strength,and type of soil testing?

1 Answers  


Why should pumping be not used in case of concreting work?

0 Answers   Bechtel,


whats is difference between anchorage length and development length

0 Answers  






what is bulkage

4 Answers  


why compression strenth of concrete is tested with a cube of size 150x150x150 mm ?

5 Answers   Gammon,


Where hinge support is used in residential building?

2 Answers  


What is the procedure of concealed plumbing in toilets?

0 Answers   Hiranandani,


Which pavement is advisable in India?(Flexible or Rigid)

6 Answers  


Differenciate between One way slab and two way slab

5 Answers  


If 16 mm dia hysd bar of grade Fe500 is needed in a beam but it is not available in the construction site but the beam has to cast in an emergency. Which dia of bar is to be used for for that situation? (If greater than 16 dia bar is not available at site)

2 Answers   Shreeji Associates,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)