How do I calculate the ground is resested for a 5 floor
building?
Answer Posted / samsul
by calculating the total superstructure load of the building
and the safe bearing capacity of the soil where the
foundation is laid down.more precisely adding (the column
weight - weight of the soil of column volume)
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How will you Engage Labours on Site?
how calculate the bearing from two coordinates?
how i get all type of short type question answer about civil engg
How to design staircase.plz tell me formula for the design the staircase.
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
Define relative co-ordinates?
How to marking the building
What is the standard volume of pharma in cub ft
specifications of fe500 steel
How cracks in concrete can be avoided?
which red: used in roof teping, then use only cement
in 100 cft = 1350 bricks in 100 cft = ? bloks
What is the density of DLC & PQC and how it is differ from normal concrete?
In cement making,what is meaning of blend,fineness,density.
How many mortar required for Brickwork of 1 Cu.m works??