how to calculate earth resistat in earthpit with earth testing kit?..

Answer / thanigaivel

In that earth tester E1 and P1 short with wire and take a lead from that loop. and put 2 spike in that mother earth 1st spike connected to E2 and p2 connected to that another spike ... that looped wire is connected to earth bit . and put the earth test with ohms .. its show the value

Is This Answer Correct ?    4 Yes 0 No

how to calculate earth resistat in earthpit with earth testing kit?..

Answer / mukesh_chavda80

with diagram please

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what are the duties of commutator in motor and generator?

6 Answers   L&T,


What is difference between ct&pt transformers?

4 Answers   Adgas,


in the farm,water tank of 8000 litter capacity situated in 12 meter above.Farm owner want to lift 7000 litter of water within 7 minute to water tank of 12 meter above.which motor having HP rating is suitable for pumping??

1 Answers   ABB, Anchor, Havells, Keltron, KSEB, L&T, vguard,


is the secondary voltage of current transformer greater than primary voltage,,,,,,,,] give the example with ct burden,current ratio,and primary and secondary side voltage?

2 Answers  


What is center gravity load in substation?

0 Answers  






What is the Difference between Power Swing and Out of Step?

1 Answers  


If you don’t have coal, salt and copper, then how would you earth your connection temporarily at a camp site.?

2 Answers   Focus,


How we calculate airgap between phases & terminal box of the transformer? any formulae.

1 Answers  


How to calculate cable size for a particular load? i have 12 MW,11KV Motor 3 Phase, what should be cablesize? What are the points to remember for cable sizing calculations?

2 Answers  


Why dose an electric meter record KVA when there is no load on a 500 KVA transformer

1 Answers  


An 11kv system consisting of an underground cable to a sub station about 300 meters away was shut down for about 10 hrs. On energising, it tripped off on earth fault about 10---20 mins later 6 times but since than it is not tripping.its already 3 weeks now. The SPAJ was found to be fine. what could be the cause.No test had been done to determine the cause of the trippings till now because of demand.

2 Answers  


what is the purpose of CT,PT

8 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)