why any Elelctricity board insist not to change the buren
of their metering CTs or PTs for metering purpose? as a
example elect. board not accepted that any customer change
their metering CT or PT core burden from 5VA to 15VA.. why?
Answer / k.prakashchandra
The more the burden ,the less the accuracy
| Is This Answer Correct ? | 1 Yes | 0 No |
what is the difference between KVAR & KVA ?
11 Answers Bombay Rayon Fashions, Hyundai, Pricol,
what is Ith current?
Advantages of using generator circuit breaker (GCB) scheme in a power station ?
i have applied for the post of RRB section engineering chennai board please send me previou papers and solved answer. my mail id jagarapusrinivas@gmail.com
WHY WE GENERATE 3 PHASE POWER ONLY AND NOT 4 OR 5 OR 6 PHASE??? PLS REPLY.
What are the application of Under voltage release?
2 Answers Techno Electric and Engineering,
Explain the different methods used in the choice of rotor slots for reduction of harmonic torques in an induction motor.
where can i get the previous years question papers for APGENCO exam.
diff between UPS and inverter?
Two electronic energy meters are connected to seperate phase wires, but connected to a looped neutral. Are these going to function correctly?
Why transformer ratings in KVA not in KW?
how fan speed decrease or increase by using regulator? thank you
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)