i need gate exam civil engineering question papers with
answers
No Answer is Posted For this Question
Be the First to Post Answer
what else we can add rather than admixture in concrete to reduce the cement quantity?
In concrete mix, water is required . we tried in case of water we are used milk. what hapened
how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???
Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?
how calculate cutting length of stell in slab and column? give brif discussion with formula?
3 Answers ATS, Gammon, Pegasus,
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
What is the lap length in your project?
11 Answers L&T, Practical Viva Questions,
What is absolute pressure? How absolute pressure is calculated?
which concrete grade has highest strenth and what is its comosition?
What is the difference between single reinforcement
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)