How do u calculate Schedule variance? What is the formula?
Explain with Example
Answer / abhishek tripathi
Schedule Metrics are related to variations between the
planned (base lined) schedule and actual schedule. Schedule
metrics basically provide you with schedule variance for
projects – scheduled completion, actual completion date and
the number of days of variance.
Schedule Variance = (Actual Duration-Planned Duration) /
(Planned Duration) * 100
| Is This Answer Correct ? | 4 Yes | 3 No |
What is a ‘use’ case and what does it include?
What is the difference between black box and white box testing?
Explain the process of project tailoring.
What are test driver and test stub and why it is required?
What is error guessing?
What do you understand by ‘test effectiveness’ and ‘test efficiency’?
What are the types of testing can be performed on facebook login page?
When you realize that there is something wrong in BDD, what will you do ?
How to test Volume in Music System?
How many defects is acceptable for a project. Is there any goal for no. of defects.
3 Answers FIC, MinMax Software,
write an e-mail introducing yourself to the client as a QA ead is not in town.
What are the testing techniques? pls let me know in detail