Answer / aswin

The basic difference in layman's terms is:

While both provide backup power during mains outage, with the UPS the switch is instantaneous whereas with the Inverter there is a gap of a second or two. This gap is OK for household gadgets such as lights, fans, fridge, etc. but not OK for computers.

In technical terms:

UPS: The mains power comes to the UPS. The AC is converted to DC and this DC is constantly charging the battery. The output of the battery is fed to the Sine wave inverter and it converts DC to AC and this feeds the equipment. Since power out is always drawn from the battery, there is no time lag when mains swicthes off; it justs stops the battery from being charged and the UPS continues to supply power till the battery runs out.

Inverter: The mains power comes to the Inverter. This is directly sent to the output but the AC is also converted to DC and this DC is constantly charging the battery. A sensor and relay mechanism checks whether the mains is ON or OFF. When the main switches OFF, the relay actuator triggers to switch from mains to inverter. Rest is same like the UPS. Because of this sensor and relay, there is a gap between triggering.

UPS involves more costly circuitary and is therefor more expensive to make and sell.

Is This Answer Correct ?    15 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what was the function of the auxillary relay?

3 Answers  


1 HP = how many Kva

5 Answers  


If a manufacturer decribes a power supply transformer as providing a secondary voltage of 24 volts when connected to a 240 volts supply, do you think they are refering to the full load or no load secondary voltage?

3 Answers  


what is the diff of mcb and mccb

2 Answers   NSN, Sterling Wilson,


Capacitor panel CT is normally fixed on Y phase of the main panel.why???

3 Answers  






What is Chatoliq Protection ?

1 Answers   Chemanol,


Why generating voltage is limited up to 22kV?

4 Answers  


installation of subsatation of33kv

0 Answers  


how electrical earthing maintenance done in industry?

0 Answers   L&T,


What is Phasing out test?

1 Answers  


what is class of SPD and dittels of all class ?

0 Answers  


What is the specification of service line (ie from electrical post to cut out) used by electricity boards used in india.i mean which material,its size etc.. please give the answer at lalkishan.p@gmail.com

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)