Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is means of ALF,kPV(min),lexc(max)at Vk,Rct@75 degree
centrigate ohm in current transformer name plate?

Answers were Sorted based on User's Feedback



what is means of ALF,kPV(min),lexc(max)at Vk,Rct@75 degree centrigate ohm in current transformer n..

Answer / santosh89

ALF--accuracy limit factor(ratio of nominal over current to the rated current)
KPV--knee point voltage(secondary voltage must be less than KVP so that ct accuracy will not hampered)
KPV=k.Is(Rct+Zs) where Rct=resistance of secondary winding at 75 c

Is This Answer Correct ?    2 Yes 0 No

what is means of ALF,kPV(min),lexc(max)at Vk,Rct@75 degree centrigate ohm in current transformer n..

Answer / m.esakkiraja

1. ALF - Accuracy Limit Factor
It is the ratio of Instrument limit primary current to the Rated primary current.

2. KPV- Knee point Voltage
It is defined as a point where 10% increase in the Secondary Voltage causes an increase in the Secondary Current by 50%.

3. Iexc- Excitation current
A transformer exciting current is the current or amperes required to energize the core.

4. Rct @75°C - Resistance of Secondary winding on CT at 75°C.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Based on CPI/CGPA they shortlist the candidates & than directly start Interview so there is no Written Exam or GD Only PI.Interview held @ MNNIT , ALLAHABAD On-Campus on 6th,Aug, 2007 & the Questions asked to me by Interview Board ( 4 People) are from HR/SummerTraining/BTP/Subject-core, POWER SYSTEM & MACHINE. time duration of I/V is about 15-20 Minutes. HR- Q.1 Name,hobbies & About family background ? Q2.What u know abt NTPC ?? Q3.Why u want to choose NTPC as ur Carrier's starting i.e power sector not any other Oragnisation or sector ?? Techincal Questions- Q1.What is the reason for transformer Noise ?? Q2.Which material is used for making Transformer oil & How u measure its dielectric strength & Name the test ? Q.3 Which Machine u will prefer 2 use if flammble gases are coming out at a place & why ?? Q4.What is relation b/w Transmission Lines & Communication Lines ? Q5.What is the maximum capacity Synchronus Machine & total powerGeneration in our country ? Q.6 In india Power generation is at 50Hz while in America its 60 hz ,why so ?? Advantage or disadvantage ?? Q.7 Maximum Generation Voltage in india ? Q8. What is the Voltage regulation & why its required n how much is permissible ? & causes of voltage variation ?? Q.9 Why electric shock is feel ?? n in a Electric Train why we didnt feel that ? Q.10 Have u seen/ experience of any power plant/ industry related to the power sector ? so these are the questions which not too diffcult i think was asked to me.

6 Answers   NTPC,


DEAR SIR,I GOT THE CALL LETTER FROM RRB, SECUNDERABD AS A JE-II SO PLEASE PROVIDE ME SOME MODEL QUESTION AND ANSWER PAPERS AND LAST YEAR QUESTION PAPERS

0 Answers  


-What should be minimum value of insulation resistance and maximum value of earth resistance at any electrical instillation and what is method of testing the same.

0 Answers  


what is acceptable leakage current for 33kv cable while doing high voltage test for cable? how to calaulate the leakage current for 33kv or any rated cable?

0 Answers  


how to test generator protection rotor earth fault relay and locked rotor test?

1 Answers  


What is the meaning of high reputuring in HRC fuse.?

1 Answers   ABB,


what time should we set to come on star contacter in stardelta starter?and for what reason we hav to set such time delay range?

2 Answers  


working

1 Answers  


What is frequency?

4 Answers   BTCL, TCS,


which one is the most common system for secondary ditibution

1 Answers  


what irequirment need to be followed when working on live equipment

0 Answers  


Befor synchronissation of Generator what test to be carried out.pl.specify with reason.

3 Answers   Kanoria,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)