For Beams sides only 1 day
For coloumns 1 day
For slabs span<4.50m 7 days
For slabs span>4.50m 14 days
Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
what is the dimensions of river sand truck trailer or trolly ?
how to calculate MR 9(derivation)
what do you understand by M25 concrete
What was asked in isro civil interview
why the profile of shell of natural draught cooling tower is hyperabolic.
rimmer in pile foundation
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
what is that one cub metre plaster in cemant and fine sand
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
satart to end steps by step process of building construction...? i want to planning theme accuretly
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
Why steel rods are produced only in even dimensions?
Minimum and maximum size of the building components
What is the purpose of the gap in the road on this bridge?