what is the diff b/w switch and filter stage in datastage

Answers were Sorted based on User's Feedback



what is the diff b/w switch and filter stage in datastage..

Answer / uday

filter:1)we can write the multiple conditions on multiple
fields
2)it supports one inputlink and n number of outputlinks
Switch:1)multiple conditions on a single field(column)
2)it supports one inputlink and 128 output links

Is This Answer Correct ?    20 Yes 0 No

what is the diff b/w switch and filter stage in datastage..

Answer / prasad

and also filter supports like =,>,<,<>,>=,<=,and,or,not operators

switch stage supports only one equal(=) operator.

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Data Stage Interview Questions

How a source file is populated?

0 Answers  


What is merge stage?

0 Answers  


how can i get 2nd highest salary in datastage?can u send me ,thanQ 2)if i had source has 2 records 1st record ie 1st column contains 1,2,3 and 2nd coulmn contains 10,10,10 i have to get target as 2nd columns as 20,30,40 how can i?

3 Answers   Accenture,


in source is like seq file in date column have dd-mm-yy dddd-mmmm-yyyy mm-dd-yy yy-dd-mm yy-mm-dd i want to display only yy-dd-mm date formats only in tgt?

2 Answers   Wipro,


in oracle target stage when we use load option and when we use upsert option?

0 Answers  






What is diff between Junk dimensions and conform dimension?

4 Answers   Polaris,


I have source file which contains duplicate data,my requirement is unique data should pass to one file and duplicate data should pass another file how?

7 Answers   CTS,


What is the difference between informatica and datastage?

0 Answers  


A flatfile contains 200 records.I want to load first 50 records at first time running the job,second 50 records at second time running and so on,how u can develop the job?pls give the steps?

3 Answers   TCS,


What is ibm datastage flow designer?

0 Answers  


What are stage variables and constants?

0 Answers  


I have the following columns in the EMP table Empid,Empname,Sal,month(Sal),year(Sal) and DOB(let us say the dob is 15th-Jan-1981) Desing a job such that the output contains the following empname,year(sal),tot(sal) and current age i.e. whether 18yrs or so on

1 Answers   Accenture,


Categories