Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why the capacitor bank is keeping on for electricity
supply and keeping it off for generator supply

Answers were Sorted based on User's Feedback



Why the capacitor bank is keeping on for electricity supply and keeping it off for generator supp..

Answer / n.parthiban

We shoud not start the enggin with leading reactive
power,leading reactive power will trip the enggin while
sink with EB due to sudden load transfer

Is This Answer Correct ?    3 Yes 1 No

Why the capacitor bank is keeping on for electricity supply and keeping it off for generator supp..

Answer / pradeepankovoor921

No answer

Is This Answer Correct ?    0 Yes 0 No

Why the capacitor bank is keeping on for electricity supply and keeping it off for generator supp..

Answer / kripal

At starting of Generator need D.C power for excitation of
field winding so for that capacitor bank keeping it off

Is This Answer Correct ?    1 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

Types of test in Switchgears, MCC, NGR and DB's how it should be procced. Can anyone give me the details here or email me to pasuvaraj.k@gmail.com

0 Answers  


please let me know , we have installed two separate motor for fire fighting system 1) 60 hp and 2) 15 hp the load is 74 AMPS and 20 AMPS then tell me the main power cable in Aluminum will be what thickness , the length is 225 mt from the main utility to fire pump house

1 Answers  


In CDG type IDMTL realy O/L , E/F, O/C which are used for out going feedrs,on R-phase o/c element, Y-phase , e/f elecment and on b -phase o/c element will be connected . Why the earth fault on center phase only, why not on other two phases?

2 Answers  


How much ampere can withstand for 2sq mm c able?

2 Answers  


What is the meaning of Insulation H for transformers????

0 Answers  


why circuit breaker closing time is always higher then tripping / opening time.

13 Answers   United Phosphorus,


A circuit breaker on detecting fault will a. Open b. Close c. Open and trigger the alarm

2 Answers  


explain PV modules in solar energy generation.

0 Answers  


What is the emf equation of a transformer?

0 Answers  


describe the Operation of induction generators from bus bars

0 Answers   AMIE,


The transmission does not have options: a)Partition noise b) Flicker noise c) resistance d) Short noise and reason

0 Answers  


why do we use bundle conductors instead of using single conductor of larger size for high voltage transmission?

7 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)