WHAT IS DIFFRENCES DCS & PLC
DCS MEANS DISTRIBUTED CONTROL SYSTEM
PLC -PROGRAMME LOGIC CONTROL
IN A PROJECT OR REFINERY, ASSOCIATED WITH MAIN EQUIPMENT-
SUCH AS BOILER,GAS TURBINE ,STEAM TURBINE ,GENERATOR
N400,230KV SUB STATION... AND BALANCE OF PLANT EQUIPMENT-
fUEL OIL SYSTEM,FUEL GAS ,FIRE FIGHTING,WATER TREATMENT,
AUXILIARY BOILER,AIR COMPRESSOR,HVAC,RAW WATER SYSTEM.
EACH SYSSTEM IS DESIGNED BY DIFFERENT SUPPLIER WITH ITS OWN
LOGIC. tHIS IS DONE BY plc CONTROLLERS.
sO, EACH SYSTEM IS INTEGRATED WITH dcs SYSTEM.
dcs IS THE MANAGEMENT SYSTEM AND INTEGRATES ALL SUB SYSTEM .
DCS INTEGRATES ALL SYSTEM CENTRALLY. oVERALL MONITORING IS
DONE AND MAINTAINS LONG TERM EVENT RECORD.
THE ENTIRE PLANT IS OPERATED start/sTOP SEQUENTIALLY.
aLSO PERMITS DECENTRALIZED OPERATION.
AND IN
Is This Answer Correct ? | 2 Yes | 0 No |
What is difference between dc three point starter and dc four point starter?
what is mean by tan-delta tap in the potential transformer??
1.why ACB is not connected in HT side what Happens? 2.how much voltage maintained in ACB breaker? 3.OLTC is connected in primary side in case secondary side connected what happened?
If single phase having 220v so why 3phase is440v.
trasnfarmaer core make
1. what is the power factor of a purely inductive load? (i) Zero (ii) Lagging (iii)Leading (iv) Unity 2. which type of transformer connection is preferred in case of power supply transformer? (i) Star/Star (ii) Delta/Delta (iii) Star/Delta (iv) Zig Zag/Star
which technique servo motor tested o.k or faulty ?
Factory acceptance test. FAT. For 132 kv transmisstion towers what is that meaning and what are the tests commonly companies perform now days.
how we do Vector group ,magnetic balance and tap changer test in Transformer?
why the AC or DC motor takes high starting current?
How to calculate the KA rating for a circuit breaker if we know the KVA rating of the generator feeding it?
while we select CT, why the CT ratio is divided by 5?? ex:250/5,15VA,CLASS-1 CT.Why it is divided by 5??Help me please