Answer / muniraj
1>production time can be reduced by reducing unnecessary
operations on the component, keep the component simple as
much as possible, which will reduce setup time.
2>component should be machined to designed tolerance. use
of advanced power tools for assembling
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / ganesh
1. Make a jigs&fixtures to reduce the assemble time. Ex. Instead of hitting the components make one fixture to press the component
2. Implement the 5s techique. it is very useful to reduce the assembly time
Is This Answer Correct ? | 2 Yes | 0 No |
plz tell me the types of air compressors? & purpose of air drier?
please send me latest hindustan petrolium papers
0 Answers HPCL, Tata Steel Limited,
what is counter weights. Why the ship cranes are not having counter weights irrespect of industrial & civil construction cranes are having counter weights.
If I can absorb 9,000 lux of sunlight in the bottom of a pool what will the temp rise be per hour, per square foot of absorbing material, per gallon be? Temp of pool deck 115 degrees, water temp 75 degrees, 120,000 lux on the pool deck
What is the materials of jib and cotter joints?
what is the diffrence between a shaper machine and aplanner machine
i am a mechanical engg.8th sem student.i want to know the syllabus and criteria,previous question paper set of section engg(RLY).please send it to my email id.pleaseeeeeeeeeeeeeeeeeeeeeee
what is the difference between pipe and a tube?
What happen when too much cylinder oil is injected in the working cylinder?
For avoiding cavity what should be NPSH?
Why and what cause of leak fuel oil in high pressure pipe of main engine?
Hi i am going to attend the interview for BHEL. can you please help out in knowing about the area of preparation. I am apprearing for Executive trainee post. Please share your views on this. Thanks