How to reduce prodction assembly time ?
Answers were Sorted based on User's Feedback
Answer / muniraj
1>production time can be reduced by reducing unnecessary
operations on the component, keep the component simple as
much as possible, which will reduce setup time.
2>component should be machined to designed tolerance. use
of advanced power tools for assembling
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / ganesh
1. Make a jigs&fixtures to reduce the assemble time. Ex. Instead of hitting the components make one fixture to press the component
2. Implement the 5s techique. it is very useful to reduce the assembly time
| Is This Answer Correct ? | 2 Yes | 0 No |
please send jindal steel and power model question papers
61 Answers Jindal, Jindal Steel and Power, MeritTrack,
How curvature effect is consideed in spring design?
difference between antifriction bearing & Journal bearing ?
I am requiering interview questions regarding Close Ferro Crome Furnaces
Why do you need a biological shield in nuclear plants?
What is the purpose of corrugated furnaces?
0 Answers ABC Inc, RRB, Siemens,
Enumerate or identify the parts of purifier bowl assembly
Is There Any guy give me detail information regarding "ISO/TS-16949-2002 " /TPM/QMS/SPC/MSA ???
Please sent JindalSteel&power,Domain & Apptitude test paper. Urgent request.mr.erajay@yahoo.com / mr.erajay@yahoo.com Tahnks in advance
what is the difference between under vacuum & under pressure boiling?
explain the effects of alloying chromium and nickel in stainless steel.
What is BMS?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)