How to reduce prodction assembly time ?

Answer Posted / muniraj

1>production time can be reduced by reducing unnecessary
operations on the component, keep the component simple as
much as possible, which will reduce setup time.
2>component should be machined to designed tolerance. use
of advanced power tools for assembling

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate bearing width

1149


What is the purpose of air blow?

1600


sir,i m mech. engg final year student, please send me technical test question with answer for gail,bhel,sail& also useful for other psu exam. thank you....

1438


water balance calculation for 1X500 tpd DRI plant?

2306


Name the indicator diagram.

1496






What are the safety devices of boiler?

1486


Dear all i have applied for section engineer post in RRB Chennai can anyone please send previous question papers please do it if u have

1394


Causes of F.O. Purifier abnormal flow?

1446


From where compressor recive power in automobile?

2792


calculate the expantion of steel bar 2,5 long if its temperature rises from 20 degrees to 250 degrees and its co effient of expantion is 0,000011 mm degrees

375


What is meant by gray body?

631


Properties of F.O. the cause damage on auxiliary boiler.

1564


How to exite natural frequencies in a overhung rotor

1619


What is the critical speed. Compare the critical speed of hollw shaft and solid shaft.

2131


What are materials used for manufacturing of gears ?

646