Answer Posted / muniraj
1>production time can be reduced by reducing unnecessary
operations on the component, keep the component simple as
much as possible, which will reduce setup time.
2>component should be machined to designed tolerance. use
of advanced power tools for assembling
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how to calculate bearing width
What is the purpose of air blow?
sir,i m mech. engg final year student, please send me technical test question with answer for gail,bhel,sail& also useful for other psu exam. thank you....
water balance calculation for 1X500 tpd DRI plant?
Name the indicator diagram.
What are the safety devices of boiler?
Dear all i have applied for section engineer post in RRB Chennai can anyone please send previous question papers please do it if u have
Causes of F.O. Purifier abnormal flow?
From where compressor recive power in automobile?
calculate the expantion of steel bar 2,5 long if its temperature rises from 20 degrees to 250 degrees and its co effient of expantion is 0,000011 mm degrees
What is meant by gray body?
Properties of F.O. the cause damage on auxiliary boiler.
How to exite natural frequencies in a overhung rotor
What is the critical speed. Compare the critical speed of hollw shaft and solid shaft.
What are materials used for manufacturing of gears ?