What are demand of crotonaldehyde99% in the worldand its
international market ?
No Answer is Posted For this Question
Be the First to Post Answer
CHEMICAL FLUID MECHANIC - EXAMPLE 3.2 : The terminal velocity of a falling object, v is given by v = sqrt [ 4g (R - r) D / (3Cr) ] where sqrt is the square root of, g = 9.81, D = 0.000208, R = 1800, r = 994.6, m = 0.000893. The Reynold number, L is given by L = rD (v) / m. The C for various conditions are : C = 24 / L for L < 0.1; C = 24 (1 + 0.14 L^0.7) / L for 0.1 <= L <= 1000; C = 0.44 for 1000 < L <= 350000; C = 0.19 - 80000 / L for 350000 < L. Find the value of v for the situation above by trial and error, ^ is power, <= is less than or equal to.
What are advantages using hollow shaft impeller?
What does the catalystic converter on an automobile really do?
Question 29 – For a Vernier scale that consists of 0.11 cm per section, estimate the length on actual standard ruler of 0.1 cm per section for 2.39 m and 0.91 m.
I HAVE BEEN SELECTED FOR IOCL PANIPAT INTERVIEW,ACCTUALLY IAM DOING APPRENTIES TRAINEE IN CPCL.IAM GOING TO ATTEND THE IOCL PANIPAT INTERVIEW.SO PLEASE HELP ME HOW I PREPARE FOR INTERVIEW BY SUBJECT AND ALSO BY FIELD.
Explain the significance of the angle of repose holds in the chemical industry?
NATURAL GAS ENGINEERING - QUESTION 26.1 : (a) In natural gas pipe sizing, the length of the pipe from the gas source metre to the farthest appliances is 60 feet. The maximum capacities for typical metallic pipes of 60 feet in length are : 66 cubic feet per hour for pipe size of 0.5 inches; 138 cubic feet per hour for pipe size of 0.75 inches; 260 cubic feet per hour for pipe size of 1 inch. By using the longest run method : (i) Find the best pipe size needed for the capacity of 75 cubic feet per hour. (ii) Estimate the suitable range of capacities for the pipe size of 1 inch. (b) The maximum capacities for typical metallic pipes of 50 feet in length are : 73 cubic feet per hour for pipe size of 0.5 inches; 151 cubic feet per hour for pipe size of 0.75 inches; 285 cubic feet per hour for pipe size of 1 inch. By using the branch method find the best pipe size needed for the capacity of 75 cubic feet per hour when the length of the pipe from the gas source metre to the appliance is 52 feet.
Whether long question or short question I can expect in the interview at IOCL ?
How can you estimate a gas flow based on two pressure measurements?
is petroleum a mixture of hydrocarbon?
Explain the procedure to estimate the friction factor involved in heat exchanger tubes?
What are some common problems associated with dilute phase pneumatic conveying?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)