how to do sudoko puzaals?
No Answer is Posted For this Question
Be the First to Post Answer
Characteristics of a model project are ––
What do you mean by tolerance factor of concrete ?
Distinguation between Developing Length and Lapping Lengh
24. Why should we hire you?
Please tell me 1 Sqm Steel 14mm center to center .200,.200
What is Refuse Area ? And What is Definition ?
what is pmc(in rigid pavement)
What are the phases inspections are done by local authority while construction?
Is bulkage is considered in crushed sand? if yes..then what is the percentage ??
How to arrive dry volume of concrete (1.52 to 1.57) ?
what radial pressure, the NP2 class rcc pipe can sustain?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)