Answer Posted / aditya richie
stone soked in water for 24 hours weighed ,it is then oven
dried for 4 hours and weighed . Difference in weights gives
water absorbed by stone . water absorption is calculated by
dividing water absorbed by dry weight of stone and
multiplying it with hundred .
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
What is rolling stock
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
What are the RISKS during the project construction?
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
What is command line?
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
How to design staircase.plz tell me formula for the design the staircase.
What do you mean by honeycomb in concrete?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
what are the challenges of being a team leader and a supervisor?