Business Administration (517)
Marketing Sales (1279)
Banking Finance (3209)
Human Resources (747)
Personnel Management (68)
Hotel Management (29)
Industrial Management (113)
Infrastructure Management (14)
IT Management (97)
Supply Chain Management (16)
Operations Management (39)
Funding (79)
Insurance (494)
Waste Management (1)
Labor Management (48)
Non Technical (73)
What criteria are you using to evaluate the organizations for which you hope to work.
How will your education help us in improving the banking services?
Do you prefer to work independently or on a team?
what is your career plan
What Is Paid Value?
If Debentures Are Issued at Par and Redeemable at Par What Journal Entry Should Be Passed?
What do you think of working in a group? : insurance sales
What will you say about G20 Summit?
you have spotted an excellent window location in a store. When you spoke to the owner, he quoted a very high price, which was beyond your budget. What would you do to convince the retailer of the genuineness as well as limit that you can pay
Explain the relationship between the balance of payments and the exchange rates of a country, giving suitable illustrations in support of your answer?
Recently i got rejected for B1 visa, if i reapply is there any chance of getting visa and is there any time gap to apply?
Hi brief the following. 1) How would we can fix the exact machinery for the excavation at construction site. 2)what is mean by 43/ 53 grades in cement? 3) what is the diff between fe 415 / fe500 and what is the usage of two grades. 4)how we can check the exact weight of one truck load of TMT rods. 5) what is the percentage of tolerance of TMT rod while receipt at site. 6) how we can test and evaluate the grade and quality of timber while receiving at construction site. 7) how we can select the right plywood for shuttering 8)what are the diff grade of RMc and how we can select the right RMC for the specific work 9)what is the ratio for binding wire for 1 ton of tmt 10) how we can select the quality bricks. what are check measures. 11) how we can select and procure the river sand for construction purpose. 12) how we can recon the store materials with actual purchased at construction site. 13) what are the documents required to transfer our own material from one site to another site between two states. 14) what are the different types of formworks and its usages 15) what are the diff types scaffolding materails and its usage 16)how we can select the right tiles for flooring, wall and other areas. 17)what are the diff types of tiles and its usages 18)what is the procedure to select the tiles for construction 19) what is the calculation method for no of tiles received at site 20)what is the common procedure to codify store and scaffolding materials at construction 21)how we can select the right granite/ marble / kota stone for the specif usage at site. 22) what are the basic items for site mobilization 23) what are the step by step construction process. 24) how we can select the right timber for doors at site.
What is RPS price?
What help does effective marketing provide with?
What should you assume about your co-workers if you want to delegate successfully?