We are using 4 MVA transformer and we provided 2 separate earthing pit for Body and 2 separate earthing pit for neutral, can we connect separate body earthing pit to other earthing pit (Equipment earthing)?
1 3013Distribution transformer we provided 2 separate earthing pit for Body and 2 separate earthing pit for neutral,we can not connect separate body earthing pit to other earthing pit but we do metal glanding in secondary side cable termination in both side, transformer and PCC panel (LT Panel), is this safe for transformer and other equipment?
1 1780What is the criteria that generally follow by distribution licenses to fix contact demand of their industrial customers?
1 1580what do you mean by every IC 74 first digit.why are you using this no.why not using another no.
1 1968Post New Electrical Engineering Questions
Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,
hello!my name is sheikh iam preparing for indian engineering servieces,please send me the old question papers..to sheikhshaazforjobs@gmail.com
what is thermal resistance of PVC Cable.
XYZ
Why squirrel cage motor can only use with low starting loads ?
sir am giving jspl exam on 19th oct . i belong to eee, so plz send previous question papers ..........to dis id abhilash203@gmail.com
What types of CMOS memories have you designed? What were their size? Speed? Configuration Process technology?
please send the IS strandard for electrical to sakthi_murugan86@yahoo.co.in
hai iam arunkumar. i have applied for an section enginner in rrb. i want lat 5 years solved question papers. if u have please sedn it to arun30682@gmail.com
two way ckt diagram can be drawn by how many ways? give diagram
What was your role in the silicon evaluation/product ramp? What tools did you use?
all the technical question with answers pleas send your email id ramar_eee@yahoo.com
pls,send the previous year written test questions.
If a current -8+6sin6t is flowing three ammeter, one is a centre zero PMMC meter, one is true rms meter and one is moving iron meter. What are the reading of these three meter respectively?
i need the curve duty cycle and amper for (150 kva @50% dyty cycle) transformer turn ratio :19 and vin 400