Sir Power transformer :- (in generating station) Alternator terminals side - Delta HT transmission line side - Star Why?
4 8023sir, What is the purpose in Generating power plant is operated Lagging PF and Above 0.9 lag PF?
3 6102can we identify the direction of power flow in transmission line by after only looking the tower
7 20337in 5 mva transformer 33/11 kv s/s what rating of capacitor bank is required & what is the fourmula for rating
6 15974As the one point of eac phase winding is connected to each other in satr connction. Even if that at distribution side collesion of two diff phases result in to blast. Why?
1 3547Post New Electrical Engineering Questions
Circuit diagram of tube light without starter using electrical choke
WHAT IS THE MEANING OF BALANCED / UNBALANCED IN STABILIZER TYPES.
Do you need any help with FEWA Electrical Supervisor exams?
I HAVE BEEN SELECTED FOR APGENCO A.E(ELECTRICAL) 2008.HOW MUCH WEIGHTAGE FOR INTERVIEW AND WRITTEN TEST.HOW I HAVE TO PREPARE. PLEASE GIVE INFORMATION IF U KNOW.WHAT ABT G.D THIS TIME.CALL RATIO 1:2
kindly send me 11KV MV motor differential protection procedure by primary injection method.
What was your role in the silicon evaluation/product ramp? What tools did you use?
Draw a SLD of DG distribution up to main LT panel?
Please send 110 kv sb station full single line drawing(sld)
I am going to appear RRB Sr. Section Engineer Exam, Electrical. Can you send me previous year questions of RRB Electrical engineer. specially Section Engineer questions. my email id is likerahulworld@gmail.com
ANY ONE TELL ME ABOUT generator synchronization panel panel to synchronise 3 gen of 250kva both automatic and manual. 2 gen output vol 415 3ph, 1 gen output vol 400 3ph SEND THE DETAILS DIAGRAM ON THIS EMAIL ADDRESS ayazleo@hotmail.com as soon as possilble best ragrds electrical engineer ayaz mahmood SAUDI TECH
as a electrical student why should i hire you?
pls someone send me sample question papers along with the key.thanks in advance
What types of CMOS memories have you designed? What were their size? Speed? Configuration Process technology?
can you please send me the technical questions and aptitude questions of honeywell and jindal steel electrical engg. question paper my e-mail ID is(kkesavanraj@gmail.com)
What will happened if the neutral of the (star connected secondry) Xformer disconnected? (if its Above KVA rated one)