I WANT YHE TECHNICAL AND ELECTRICAL SPECIFICATIONS OF 2x4MW 11KV 2x10MW 11KV 2x25MW 11KV 2x100MW 11KV HYDEL POWER PLANT i.e PROTECTION SYSTEM,MONITORING,CONTROL SYSTEM,GENERATION,SYNCHRONISATION,METERING PLEASE SEND THE DETAILS TO MY MAIL ID SPRAVEEN_222@YAHOO.CO.IN
2095Can 4pole (3 phase+neautral )RCCB proper functioning in only 3 phase load (no neautral, no Earth) ?
2153how can we decide where we have to DYn11 or other vector group transformer
BSL, Knight Frank, Security Printing and Minting Corporation of India Limited,
4 32572What is polarisation index value?.(pi value) Simple & brief definition of polarisation index?..
7 19178Please clarify 1. Icw: rated short circuit working withstand capacity 2. Icu: Rated ultimate breaking capacity 3. Ics: Rated service short circut withstand capacity 4. other specification of ACB
2736explain how the power is distributed from a power plant to a consumer.explain step wise in detail
1 4280what r substations?what r there work?why voltages r incresed and then reduced during distribution of power
1927The transmission does not have options: a)Partition noise b) Flicker noise c) resistance d) Short noise and reason
2440* Signal transmission in sky wave propagation is due to ? a) Reforction of wave b) Reflection of wave c) Pierus through Inosphere d) None and Reason for this is????
2 6016Post New Electrical Engineering Questions
WHAT IS MOBILE SUB-STATION? & REALLY BENEFIT IN INDIA
how we will deside the high voltage value
Why in metering Ct for ammeters ct secondary side is grounded for each Ct but not in case of CBCT (Core balance current transformer)..kindly some1 highlights the reason..is it because net flux is zero?
why we use 630mm single core cable for transformer secondary side and why two neutral cable
WHAT KIND OF LIGHTENING PROTECTION SCHEMS CAN BE ADOPTED FOR THE FLAT ROOF OF BIG DIMENSION.
how i can calculate the size for fire cable
Electronic circuit
How to calculate the Efficiency of Chiller
difrent between vcb acb sf6 and mccb breakers
I want to merge a cable..in between two metering Cubicals which contains CT's and PT's and Energy meter..before taking merger..what are the common things required?
what is the difference between changer, converter and transformer?
in ACB breaker requireding 3200Amps. buscoupler getting OFF mode and again it reset and getting normal position give me a required answer?
Zone of protection and tripping scheme of arc protection relay.
Compare salient pole and cylindrical rotor machines.
if voltage bt phase & nutral is 38v in a panel board . whats the root cause.