Is there a necessity for providing expansion joints in long RCC structure(say a wall of a water retaining structure)- say approximately 50 metres in length and about 4 metres high? What will be the limitations?
2 8383how to calculate quantities of sand , cement & aggregate in 1m3 - M20 , 1m2 of 6mm/12mm/20mm plaster , 1m3 20cm/ 1m2 of 10cm brick wall, paint quantity for 1m2 snowcem and lime painting?
3 70934how do we calculate wastage of steel in the site,what r the items to taken into account for wastage calculation?
4 36221Post New Civil Engineering Questions
How to calculate unit weight of concrete for m40 grade.
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
How to design staircase.plz tell me formula for the design the staircase.
What is the density of DLC & PQC and how it is differ from normal concrete?
How to calculate laplength for 3 floors
Mention what are the composition of a landfill?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
How to find out kg per Sft ?
how lap length is increased with increase of Grade of steel?
What is meant by cartesian coordinate system?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
how to create our resume?
How many feet are in 4 square yards?
What is difference between limit state and working stress method? How it is applies in building structure.
indian standard split spoon sampler