what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
UPSC,
1 4448find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
UPSC,
2313the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
UPSC,
2434a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
Sail,
24271) what is the difference between development length & overlap length ? 2) why extras are provided at top and bootom in a beam of slab? 3) why stirrups are provided at 0.3l at supports and 0.4l at center? 4) is column a compression memeber if yes how & beam is which type of memeber?
4 28983Post New Civil Engineering Questions
What is meant by autocad?
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
How to calculate the force on a column of three story building. What should be the base concrete height?.
How you can turn off the display for dimension in CAD?
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
Which ratio use for cement selery???
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
What is the primary difference between adsorption and absorption?
How much cement and sand required for 9"brick wall per square metre
What is the difference between one-way slab and two-way slab?
What you understand by building codes?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
Define the various stages of the project planning process in construction.
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38