what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
UPSC,
1 3517find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
UPSC,
1798the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
UPSC,
1875a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
Sail,
18631) what is the difference between development length & overlap length ? 2) why extras are provided at top and bootom in a beam of slab? 3) why stirrups are provided at 0.3l at supports and 0.4l at center? 4) is column a compression memeber if yes how & beam is which type of memeber?
4 27086Post New Civil Engineering Questions
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
why the profile of shell of natural draught cooling tower is hyperabolic.
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
How much percentage of brick bats allowed in CD-75 bricks
what is cross hair cursor?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
How will be cutting in timber plate size 600*400 column size
How to calculate the crank rod in slab
What is a tensile strength? What is the tensile strength of wood?
what is w/c ratio in dry lean concrete for m10 mix design
may i know the detailed description of cutting length
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
what is mean by reestimation?
Sir how to find cutting length for footing steel bars in the shape of "u"
procedure for preliminary selection of size of column of 5 storey building