Civil Engineering Interview Questions
Questions Answers Views Company eMail

after temping in cbr mould keep how many hours mould in water

2 2928

define the grain size analysis and what is the silt size?

2 5969

what is the method of all soil testing in lab?

2 8094




how to do sudoko puzaals?

929

What is the difference between lap splice length and development length of rebars?

4 26428

Required Qty of Cement Mortor for 3"x3"x1' groove filling?

2 2844

Hi is it any equation or relationship that describe the stress-strain diagram in concrete deep beam?

1 2846

What is mean by Rolling Margin Of Steel????

L&T, NCCL, Dilip Buildcon,

4 77237




For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

832

WHAT IS TEAM SIZE IN CONSTRUCTION WORK

2 3701

during site visit if i find voilation going on,what can i do,how i act?

3 3220

What is Soil & Whats the type of soil are there? What is Ultimate & safe stress?

L&T,

1 4776

why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?

1770

what is the difference between ribbed steel & tor Steel ?

1 10675

do we decide reinforcement steel , based on bending moment ? give example with continous slab?

1158


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

Can we use concrete of slump cone in cube casting in which we have already measured slump?

414


how to clculate the %of concrete strenght achive after curing?load

908


how to calculate the no of cement bags required for 100sqft of area 12 mm thick plastering in proportion of 1:3,1:4,1:5,1:6?

1280


1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM

1703


what is the minimum compressive strength of clay brick

834






What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)

2841


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

974


any book or article on pumped concrete.

839


construction workers how much time take one work or qty

219


please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)

462


what is the design procedure for building

923


how to design and calculate materail quantity for concrete speedbreaker ?

1550


one steel fixers how much ton steel fabrication he will do same how much tone he will binding?

626


225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.

1962


IS code for Rolling Margin of steel

830