Civil Engineering Interview Questions
Questions Answers Views Company eMail

I'm constructing my house, now at lintel level. I need belt concrete with laft..length - 22ft, berth- 11ft, one side laft for 2ft, *22ft length. Kindly inform me centring cost only, without material cost.

1369

how to calculate rate analysis for shuttering of waffle slab

1729

for gravel roads in India to get 1feet height how much height we have to fill

Sunrise,

1241

93 sqmtrs area how many sand and how many cement is requir in 1;5 ratio

Godrej,

1 2915

how we can say that concrete is a plastic concrete

1 2321

What is difference between ceramic and vitrified tile

Student,

1 2948

what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain

KSP Infra,

1307

How to calculate bottom width of landing in a staircase

Tata Steel Limited,

1 2924

what is the formula for calculating volume of isolated footing? i am not asking for the sloped footing, i am asking for normal rectangle isolated footing, pls add diagram or linkof diagram with answere

Private,

1332

what is the formula for calculating concrete in circular column ? pls explain with diagram add a link for diagram

jlpl,

1 11278

how should i calculate the concrete volume in a circular RCC wall ? what is the formula pls add diagram link for explaing

Private,

1 8752

when we calculate concrete volume in footing the column along with footing up to the ground level is also taken or not ?

Gammon, Private,

1 2088

Sand density

3 3380

Why provide strripus in a column minimum and maximum spacing.

1 3214

how can calculate cutting length of diamond ring

1361


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u

1883


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

1664


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1937


Pls explain me about tension and compression in a flat slab

1583


what would be the design load of R.C.C Cooling tower per cell.?

1553






what is called Bulk Density of aggregate?

1432


a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

12669


in staad ,why we realease a moment of a member ? what is affect if we realease a moment

1721


What is the effect of a building collapse?

613


Formula of mid span bar

1457


Can we apply curing compound on ceiling (slab Bottom)

351


Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam

5118


What are the different types of runners?

672


Time required for curing of wall tiles before fixing

1754


how to find out hard strata in bored pile when the DMC method adopted.

5306