How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
1805How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
1812What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
1745What is the actual formula to calculate dry consumption of 1cubic meter m20 Concrete???? Plzz tell seniors it is urgent..
1 3134Which is economical... A column of size 9"*9" Using M20 Or a column of Size 9"*12" Using M15
L&T,
3 5141what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
2096Post New Civil Engineering Questions
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
Explain what is the difference between built area and super built up area?
why demand factor less then 1 ?
what is civil engineer greatest strength and weakness?
what is features of a typ-ical modern air-conditioning installation?
what is the 0 value in quantity surveying
How to find permissible diagonal tensile stress in reinforced brick work
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
What is Architect-Prepared Contract?
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
where i can get material costs on weekly basis
What is missing report and how to prepare