Civil Engineering Interview Questions
Questions Answers Views Company eMail

I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??

477

For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate

406

How much material is required for constructing a 2 Lane 2Km rigid pavement road

HCC,

783




Is bulkage is considered in crushed sand? if yes..then what is the percentage ??

1 1054

What applicable rate of wct in bihar

548

Ehat slump test of column & retaing wall.

Student,

1 1101

Difine coffer dam ?

1 1066

what is quantity of sand required to plaster wall about 1000 sq ft

1 1378




How to calculate water cement ratio in mix desion

Delta,

2 1825

1 cum of 60*25*25 block cost 187 dirhams. Find the cost of 1 sqm of block ?

BPO, Vastu Vihar,

1 1114

how much percent are used 20mm,10mm?

SCC,

558

what is curing?

BSL,

3 1886

How to find the requirement of cement and sand for the 1cum of rr masonry work

S Tech,

1 1071

how calucate cement sand ratio for plstering

DMRC,

641

what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing

893


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

1248


please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering

147


Ratio for 4500 psi concrete

255


how much cement and sand consuptin in 4 inch siporex walls 100 sq ft

1688


IS code for Rolling Margin of steel

832






How can we demolish concrete beams?

889


pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width

206


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

1075


how much to get of BRC lapping in full yield and half yield ?

905


What is oneside mat. And explain 

1218


how u design STAGING for Superstructure in BRIDGE construction?

1036


what does the track parameter mean in staad.pro?

3879


Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in

1134


how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )

1256


How will be cutting in timber plate size 600*400 column size

430