How to calculate the shuttering materials i.e MS sheet,Props,Acrow Spans,2'x3' Runner,4'x3' Runner & beam plywood bottom, sides in thumb rules in slab area
TATA,
1 5802What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
1097Post New Civil Engineering Questions
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
Why should you consider yourself fit to be hired by jindal steel.
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
What is Density of cement, sand & aggregate ?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
what is raft foundation
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
What is the difference between Fe 500, Fe 500 D and Fe 515.
How you can turn off the display for dimension in CAD?
what is SDLC ?and write a 'c'program for to swapping the three numbers?
Which tests are performed on soil to decide the type of foundation to be provided.
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?