Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
DBL,
1860Types of Bearings (Placed on Pedestrals) for Bridges? and mention the function of bearing?
DBL,
1 3065how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
1840I've 47'-6" x 89'-6" of flat RCC Slab 12mm dia 8" c/c. Please calculate the total weight of slab, weight of steel, and how much dead load it contains. Thanks
1 3643Materials datas like cement sand steel brick 20&40mm aggregate required per sqft of building?
2 3798i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
QRI,
1702i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
1890Post New Civil Engineering Questions
what is civil engineer greatest strength and weakness?
Explain the difference between shear and tensile strength.
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
What do we mean by partial moment release ??
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
What is fineness modulus ? and its sieve # ?
what is the clear cover for shearwall?
cement and sand required for one block of size 0.23*0.15*0.46
what is total volume of ingredients used in concrete accordingly
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
Advantage of Aluminum form work in terms of activities can be skip and cost too
Explain the different types of roofing systems?
How to cal. The weight of hollow pipe?
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...