Used Cement Mortar, Cement & Sand in 1 Square Meter or 1 Square Feet For 10-18mm Thick Plaster ? (1:6) (1:4)(1:3)
3 11052we are provide groove at sides of door & window frames, columns & beams any water dampness & seepage in external side? explain it
1 4417what if i want to lap a 20mm dia and a 16mm dia together wat will be the lap length?? a) 1m b) 80mm
5 12364Post New Civil Engineering Questions
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
What is the per cu. mt. price of ready mix in Gujarat region.?
what is the difference between replacement of cement by groundnut shell ash
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
pls mail some more tecnical qustions at msaranya2610@gmail.com
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
What is Density of cement, sand & aggregate ?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?