Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) The function of a transistor used in any of the ics is to perform switching action and not amplification. Then why diodes are not used instead of transistors as diodes also exhibit the same switching action?
1164In a binary data sequence, the duration of symbol 0 or 1 is 1ms. If a carrier of freq 4khz is used in ask, what is the minimum transmission bandwidth required? What is min bandwidth?
952Explain why does all cellular networks have same shape of sim? Why is it designed in such a particular shape? Does it have any other shape?
985Tell me why is 400 hz used for flight instruments and radio transmission system in aviation industry universally?
986Noise with uniform power spectral density of n0w/hz is passed through a filter h (w) = 2 exp(-jwtd) followed by an ideal low pass filter of bandwidth bhz. What is the output noise power in watts?
1281
Which impurities form hard scale and which impurities soft scale ?
Define what do you mean by donor and acceptor impurities?
What is the allowable -ve crankcase pressure (vacuum) in the gas engine of 1.5 mw?
what is the difference between composite key and primary key in sap abap
How much current will a 5 HP delta connected motor at no load will take?Is tat need a starter
What tools are used to test TCP/IP
How many types of probe used in cro?
What is profibus?
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
how does the thyistor work in dc drive?
why we open open condenser vacume early when the unit get balck?
What do you mean by KG and KGS in Diesel Engine
Write down the name of 2 lady Bir Pratin of Bangladesh
Direction of flow of active power and reactive power with logic?