1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
NA,
1770ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.27 : A biochemical engineering consultancy applies construction accounting in its finance. Its project began on 1 January 2010. Total revenue generated from the project was $9000. On 1 January 2011 as the budget, $2000 had been spent, with $6000 expected. However, the project cost increased latter, causing deviation from its initial budget on 1 January 2012, where $7000 had been spent, with $1400 expected. Let (estimated total cost) = (spent cost) + (expected cost to be spent), (percentage completion) = 100 (spent cost) / (estimated total costs), (total expected profits) = (total revenue) - (estimated total costs). Calculate : (a) total expected profits on 1 January 2011 and 1 January 2012; (b) estimated total cost as and not as the budget; (c) percentage completion of the project since the project began, in the first and second years.
1 1162How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
1184Why we make body earthing of transformer and what will be the size of the copper wire for this purpose related to KVA Capacity of the Transformer as per code.
974Why we make earth connection with Transformer Body and What will be the minimum size of copper wire as per code with respect to KVA rating of Transformer?
1283What is formula of capacitor for 1-phase power connection.how to improve PF. Suppose I want to connect capacitor in refrigerator to reduce power consumptions.
1067What are the no-load losses for the 11000/415V transformer with the following rated capacity? 1.1500 kVA 2. 2000 kVA 3. 2500 kVA 4. 3000 kVA
1150ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.28 : In the development of a small engineering facility for biochemical processing, completed contract method is applied in its construction accounting. In a short contract period, let the (contract price) = A. Let the (costs to date) = B; (estimated cost to complete) = C. (a) Find the values of : (i) estimated total costs; (ii) total estimated profit; (iii) percent completion to date. (b) If the project contract is 100 % completed : (i) find the total gross profit recognized; (ii) what is the exact numerical value of C?
1 1294
what is two point starter?
I use 20 nos led tube 4feet, in pathway 100mtr approximate, so what size cable i use for lighting
How to work E.L.C.B and how to connect in circuit.
In connections of mcb, is it necessary that the incoming side supply should be connected at top side of mcb. Whether this has any effect in tripping of mcb in case of fault?
plz send me questions related to vlsi backend jobs....
at what pressure ply-wood is obtained by gluing wooden sheets
What is the profile of QA engineer
What is the method of estamating of cable, CB,MCB ?
what is KSR type transmission tower? What is LSR type transmission tower?
how to find Harmonics and types as per the equipemnts
Coverage of 25mm.thick ratio of 1:4 cement mortar?
what is the reactance,capacitance & impedence electrical armoured & unarmored Cables.
How to control the Relative humidity in Air handling unit in Pharmaceutical company ,the AHU is comprised with DX system(Cooling coil) and dry heaters. We are facing the RH issue low side and higher side.
Define color palette?
What is meant by linearity?