Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) ASTM D 3455 - Standard Test Methods for Compatibility of Construction Material with Electrical Insulating Oil of Petroleum Origin has been used for Testing Transformer Oils with a product placed in it. Aged Control Oil has a Power Factor of 0.032% at 100°C. Aged Oil with a Test component has a Power Factor of 0.093% at 100°. Is this increase acceptable? If not why? How much increase is acceptable?
1978What are the areas where I need to make improvement? (Please provide examples and suggestions for improvement).
1577Hi, I'm running plastic reprocessing company where all motors are running only in delta. Due to that when I use start my 30 hp motor my transformer gets fuse. Where it happens two times a day. I gt a suggestion from a person about Automatic Power Factor Controller APFC. Is it useful for my problem??? Or is der any other way for solving this problem?? Upgrading the transformer is difficult. Pls give Me ur suggestion. Waiting for ur reply.
2 2843Question 58 – In the design of a solar power system steps of calculations below are followed : (a) The power output of the inverter of the of the solar panel is 100 watts. What is the power input, Pin to the inverter when the efficiency of the inverter is 50 %? (b) If the rated power of the inverter is 300 watts, how many inverter is needed for the solar panel? (c) Charge controller of V = 12 volts is used to supply power to the inverter. What is the input current I to the inverter? (d) If the charge controller capacity is 10 A, how many charge controllers are needed? (e) If a biochemical mixer consumes 100 watts, running for 2 hours per day, what is the energy consumption in kilowatt hour per day? (f) What is the input energy needed when the efficiency of the inverter is 50 %? (g) If your area receives 2.88 hours of full sunlight per day, how much energy, in kilowatt hour can be produced per day when one solar panel can produce 20 watts of power? (h) If you know that you have to produce total energy as the answer for (f), how many solar panels are needed? (i) Each V = 12 V battery has 5 ampere hours. If the total energy needed is in answer (f), then how many batteries are needed to run the biochemical mixer if without sunlight for 3 days?
1 2400Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
1841
How to calculate the multiplying factor for energy meter with ct ratio given
19. Name different types of TRXs which supports different GSM bands 20. ODU LED shows orange – what is the significance?
Name different types of marine diesel engines?
If you have a fuel valve with a pressure applied, what is the stress to the open and closed valve?
Differentiate between stainless steel and alloy steel?
What is ball bearing concept & its design.
Explain the concept of casting and forging?
Define what is meant by hardening ability of metals?
how to compare with Relay settings for HT< panels, RMU panel, and PSS CSS transformer?? 1) Load amps, 2)Tripping time, 3) CT ratio, 4)Cable size 5) Transformer KVA rating 6) transformer full load amps
what is punching force required for embossing of depth 3.5mm and diameter 58mm
What is ignition module of a CAT Gas Genset G-3508 Engine, Alternator SR4B Series. HOw its checked for correct functioning.Is it repiarable or replacable?
DIFFRENCE BETWEEN ISO AND TS
A ii kv 1200 A Breaker combination fixed in a cubicle. How many ampere Fuse is required? If fuse is not using, Why?
what is mean by kneepoint voltage? when it will happen? ( my doubt is, if CT secondary is open means ct get saturation or blas? what are factors are required for calculations? plz give currect anws:
do anyone out there know where to find a compleete list on acronyms/abbreviations used in offshore electric engineering. MCB - Micro Circuit Breaker, MCCB-Mouldes Case Circuit Breaker, ELCB-Earth Lekage Circuit Breaker, ELMCB- etc.....