Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) compare the delay in sending x-bit msg over k-hop path in ckt switched nw nin lightil loaded packet swithed nw. the ckt setup time is s per hop,the packet size is p bits n data rate is' b' bps under what condition does packet nw have lower delay?
1873can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
1907how to know the bearing number if we know the bearing outer dia. and inner dia and width of bearing?
PGES,
1 2793
A well system is when , no. of bus bar is less or more. Tell me the concept of it.
what is the reason for indication of light in the earth lamps of main switchboard.if there is an earth why does one lamp get dim and the other two bright.
Define why half-wave rectifiers are generally not used in dc power supply?
Define Grashof number and its significance?
How to calculate canal slope curvature qty!
Explain what is meant by repetition of information and inability to represent information. Explain why each of these properties may indicate a bad relational database design.
Define linen fiber?
Which liquid can dissolve gold?
Define piezo-electric effect?
Sir, I wish to appear for the written test in the year 2009. But i have no syllabus on the basis of that the exam was held. So if you kindly give me the syllabus,it's easy for me to be prepared. I have already registered through online,and that no is 10857
Define pair?
What is grading?
Why steel is preferred for construction of aircraft?
Name any two economical factors affecting the entrepreneurial development
Volume of 25kg putty bag & 40 kg putty bag volume??