Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) 1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
2016if a 2 ohm resistor,2 ohm capacitor and a 2 ohm inductor is connected parallely to 12v source.Then what is the value of current in each branch.Is current flows in each branch at the same time?If not so then provide the proper sequence
1 2984Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
1671According to ohms law voltage proportional to current, then why should current rating is low with high voltage rating in transformer?
KEC,
5 7676
when it is possible kvrah lead & fundamental kwh be equal in electonic trivector meters (3 ph)
Wats the formula of eccentric footing and how was calculated from concrete qty
Calculation of Pier Cap with tapper area?
I have problem in APFC panel -0.44 while load ON time, i have replaced APFC display & checked the CT supply are ok. how to solve the problem
write a c program which accepts input as Anu.B.Kapoor and gives output as:Kapoor.A.B plz send me the ans
what is the significance of terminal voltage and phase sequence in the operation of paralleling of two generators?
How can you separate hydrogen peroxide into hydrogen and oxygen?
Define damping ratio.
Define amplitude modulation?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
What is diff b/w TON and BTU for Air conditioner?
What year was the keystone power plant in Indiana County constructed?
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
Without air traffic control, what is the minimum descent rate can descend the plane?
Give an expression for average voltage of single phase semiconverters?