Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) hii sir. how will CAE/CFD courses useful to B.tech freshers? is this courses useful to getting job in automobile industry? plz give rply..
2095what should be the deduction for bend in stirrups while calculating cutting length? Is it 1 dia at each bend?
6 11799How to distinguish that the soil is clay, silt, sand & murrum at site. (just by looking at it with out doing the sieve analysis test??
3 13515temp of cast resin 1500kva tx formerwent up to 138.c but came down very fast to about 100.c within 20 mins when load was reduced from 70% to 60%
1922
what is integrated ac contact circuit
If Dg set load increase 25%, How much increase fuel Consumption (15 kva 2 cylinder DG set)
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
Which is first stress or strain?
How can you sized or estimate the ligthning arrester current rating?
Define pole pitch?
What is the method adopted to minimize shell side pressure drop in a shell?
why -48v is used for BTS in telecom?
Serial to parallel conversion is done by ?
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
Is OHNS steel is equivalent to O1 tool steel? Suppliers give OHNS material for AISI O1 STEEL telling that both are equivalent materials. Is this correct?
Name the safety devices of diesel engine?
In case of HV test on medium voltage cables, BS is asking for 4 U0 where as IEC is asking for 3.5 U0. Can any one advise me how this 3.5 times or 4 times U0 is derived?
Horse power of i.c. Engines can be expressed as rac rating, sae rating, or din rating. To which countries these standards belong ?
how electrical earthing maintenance done in industry?