Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • CCCL aptitute test questions (2)
  • CCCL interview questions (45)
  • CCCL technical test questions (7)



CCCL Civil Engineering Interview Questions
Questions Answers Views Company eMail

give me the rate analysis for Bituminous Macadam and SDBC

5081

how 1.52 factor comes while calculating no of bags of cement...from 1:2:4 design mix?

4 12114

HOW TO CALCULATE REINFORCMENT IN STAIRCASE CRANKED BEAM

1 7725

How much Strength of the cube can attain in 7days comparative 28 days strength?(as per IS code) ( specify the ref.clause also)

8 7926

how to calculate the runner (2*3) qty in cft. the length is 8 feet.

6 21741





What is portland cement

3 5375

how to calculate steel for beam of simple home and for heavy buliding ? explain me briefly

3 4187

material cost to cast m20 grade rcc

1 1277

1:6 mortar, how many self life hours ?

4 10125

what is stress?

4 4417

How can I check the quality of sand,brick,and aggregateat site without using any labouratory test?

1 5884

what is the stirrups? and which condition it is used?

6 6419

how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

1511

What is ratio if m30

6 6308

Why we add salt in silt content test of sand? Full reason ?

1 3479

Post New CCCL Civil Engineering Interview Questions



Un-Answered Questions

what is the use of TSocketDispatcher?

1039


how to write html code with ssl

862


Why slip ring ind. motor power consumption is low compare to induction motor .same 90 kw motor used same load output

521


A 100KVA SINGLE PHASE TRANSFORMER 10000/200V,50HZ REQUIRES 300V AT HV SIDE TO CIRCULATE FULL LOAD CURRENT WITH LV SHORT CIRCUITED.THE INTAKE IS 1000W.THE % OF REGULATION ON FULL LOAD AT 0.8 PF LAGGING WILL BE HOW MUCH AND THE SECONDARY TERMINAL VOLTAGE ON 0.8 PF LEADING WILL BE

1130


Write the total description of Ultra Commissioning.

821






Hi! Greetings of the day. Can somebody tell me about as built duct sheet area calculation method. As we know that for this purpose A = (W+H)*2*L. But I have query about multiplication factors for elbows, tappers, offsets etc if there is any. Also refer the papers if available. Please revert. Thanks in advance.

626


tell me few points when u become TL

1367


help me i need a c++ program which takes sequesnce of characters and outputed sequence of their token taypes, work same compiler in lexical analysis phase

1061


are tpt, freight & packing charges part of sales & purchase ??

984


can we use ASCII ,CDUP,SENDPASV commands in SFTP?

2335


Why Delphi drawing functions draw one pixel short?

1962


sir,i have L&T infotech campus placements in the next week. can u please send me the actual procedure,previous written test papers and technical questions?

2351


Expand-------NAC

971


water leak detection system question & answer

1098


How to use the TUpdateSQLProvider.OnUpdateRecord method ?

1046






CCCL Civil Engineering Interview Questions
    Civil Engineering (45)
  • Mechanical Engineering (1)
  • Electrical Engineering (3)
  • Electronics Communications (1)
  • Architecture Design AllOther (3)
  • General Knowledge_Current Affairs (1)