IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE
METHOD IS BEST?
I THINK WORKING STRESS METHOD IS BEST?
EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST
IS;1913SQ.MM
SAME TIME WORKING STRESS METHOD IS ;2213.
SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE
THEN LIMIT STATE METHOD?
MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS

Answers were Sorted based on User's Feedback



IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE METHOD IS BEST? I THINK WORKING STRESS M..

Answer / surjya

1)Working stress method is only available upto hooks law..i.e stress is directly proportional to strain..but in nature no matters are totally elastic in nature and does not obeys hooks law...so we introduced a new LIMIT STATE METHOD where u can design beyond the elastic limit upto plastic limit... 2)In working stress method the design is done for any structural element upto uncertain durability but in limit state the durability is limited and safe.
3)Material;time;cost of construction more in working stress....so its too much less efficient than Limt state method.

Is This Answer Correct ?    0 Yes 0 No

IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE METHOD IS BEST? I THINK WORKING STRESS M..

Answer / bond

U know nothig about civil engineering. go and study first
before putting such stupid questions..

Is This Answer Correct ?    14 Yes 22 No

Post New Answer

More Civil Engineering Interview Questions

while measuring slab for concrete Quantity it is practiced that steel quantity is not deducted in that particular qty.why?

0 Answers  


pls tell me , what is the density of cement when normal packed

4 Answers  


What is the strength of normal brick in india

3 Answers  


TELL ME THE EQUATION FOR OGEE SPILLWAY

0 Answers   TCE,


what is the density of concrete & steel? where we are using pycnometer? what is bulking of sand? what is under reinforced & over reinforced? what is balanced section?

3 Answers  






how many average of shuttering in one cubic meter concrete

5 Answers  


beam top main reinforcement(25mm) was drilled off by mistakely when making drill hole for dummy columns. any one can give useful information for this issue or related code or websites.

3 Answers  


difference between minor and major bridge.

5 Answers   Aecom, Bhel,


how to tie 10 legged stirrups

0 Answers   Khan,


as per is code, what is the minimum content of opc and ppc cement for rcc structure

0 Answers  


For the construction project what capital cost has to be taken in consideration?

0 Answers  


how i get all type of short type question answer about civil engg

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)