Answer / ravi
1)150to180Sft or14 to 16 Smt 2)formwork 600Sft of roof
shutering
or 112 Sft of plain door shutering
3)slab 1200Sft
beem 1.2 Ton
column 1.3 Ton
| Is This Answer Correct ? | 11 Yes | 7 No |
i have a bar of 20 and 16, lap length is 48*dia of bar, what is the lap length here
1sqm tile laying how much cement required?
I need old MMUP exam question and answer for Civil engineering
How much cement,sand,bricks and water needed for 1square metre brick work?
what is the stripping time of beam?
why we are condecting the slump test for concrete?
Why we provide chair for slab reinforcement? How to place chair distributors to distributors or top distributors to bottom main?
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
If your drg told used 600 dia hume pipe for culvert but due to market problem available 300 dia hume pipe,den how much humepipe you provide(300 dia) instead of 600 dia?
what is the IS code no. for concrete wastage?
what is density on steel bars?
what is the minimum spacing required for slab & beam reinforcement
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)