If your drg told used 600 dia hume pipe for culvert but due to market problem available 300 dia hume pipe,den how much humepipe you provide(300 dia) instead of 600 dia?
How many cncrete grades are used for construction,explain with proportion,grades and where it used
what is the MSL?where is it located?
2 Answers C-Tech RC Design, Era Infra Engineering, IVRCL,
Describe the sections included in a typical bill of quantities
What is the per square fee cost of external development of a multistorey group housing project
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
differance bet QA & Qc
How many cover blocks should be provided for 10 sq.m area?
what is high type road and low type roads
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
Insted of water is there any liquid to mix in concrete / in mortar ?
How many axes do cartesian coordinate system has?
what is the unit weight of steel(kg/cum)& unit weight of concrete in(kg/cum)?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)