what,s the clear cover of beam,slab,column,lintel and
foundation?

Answers were Sorted based on User's Feedback



what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / durairajan

clear cover beam is 30mm and slab is 20mm and column is
40mm and lintel is 15mm

Is This Answer Correct ?    102 Yes 100 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / suryanarayana

Clear cover is depends on exposure condition
slab 20mm
wall 25mm
beam 30mm
column 40 mm
footing 50mm
protect from corrosion of steel

Is This Answer Correct ?    5 Yes 3 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / pavan

Footing - 50 mm
Columng- 40 mm
Beam - 25 mm
Slab - 20 or 25 mm

Is This Answer Correct ?    2 Yes 0 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / ranjan kishore

for slab it is=20mm but can be reduced to 15 mm for mild exposure and bar dia less than 12mm.
beam=25mm
column=40mm
footing=50mm

Is This Answer Correct ?    2 Yes 0 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / nitesh kushwaha

Clear cover for slab -15 mm
Beam -25 mm
Column-40 mm
Foundation -50 mm
Lintel -15 mn

Is This Answer Correct ?    2 Yes 0 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / vasanth.j

concrete Nominal clear cover details for some structures
1.Slab 15mm
2.Column 40mm
3.Beam 30mm
4.Footing 40mm
Clear cover is also depend on the corrosion free and fire resisting for reinforcements.

Is This Answer Correct ?    33 Yes 32 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / bhagya

clear cover beam is 30mm
slab is 20mm
column is 40mm
lintel is 15mm
founadation is 50mm
lintels is 15mm

Is This Answer Correct ?    2 Yes 1 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / sandy

As per IS 456 2000
Slab-20mm
Beam/ Column-25mm or 2xDia of Main feinforcement.Which ever is greater.
Footing- Bottom 50mm
Footing side- 50 to 75mm depend on soil condition.
Pile - same as column.

Is This Answer Correct ?    1 Yes 0 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / civilis infra(trada chirag)

It's depends on exposure condition and it varius from condition to conditon genreally
Slab= 15 to 20 mm
Beam= 25mm
Column=40mm
Footing=50mm

Is This Answer Correct ?    1 Yes 0 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / noman ali

Clear cover of sunshade - 25mm

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what type pressure pipe use in sewerage & water supply?

1 Answers   Tulip,


Calculate the quantity of concrete for the following. 2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m length.

13 Answers  


For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?

0 Answers   CDM Smith,


there is a residential building L = 20' B = 30' H = 20'  stairs L = 3' H = 20' calculate the numbers of Threads and risers from stairs with formula

2 Answers  


What is the amount of cement,sand and course aggregate(jully)(in kgs) required for the RCC of an area of 450 square feet and 5 inch depth if the concrete mixing ratio is 1:2:4(cement:sand:jully)?your answer will be very helpful.

1 Answers  






compressive strength of country bricks in india

4 Answers   ATS,


difference between specification and method of statement

3 Answers   L&T,


how to calculate the steel quantity for columns and beams

7 Answers   CMR,


Is there a necessity for providing expansion joints in long RCC structure(say a wall of a water retaining structure)- say approximately 50 metres in length and about 4 metres high? What will be the limitations?

2 Answers  


how do you intend to overcome such challenges?

1 Answers   Savanna Energy,


How much cement,sand,bricks and water needed for 1square metre brick work?

0 Answers  


In which grade of steel the laping length required is more,Fe 415 or Fe 500 ? and why?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)