according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
No Answer is Posted For this Question
Be the First to Post Answer
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
the size of one block is 390mm×190mm×190mm.then how much block will required for 4.6m × 3.4m wall.the thickness of wall is 190mm
WHAT IS THE MINIMUM WATER CONTENT PER ONE BAG CEMENT FOR M20 CONCRETE
1:6 brick masonry cement and sand calculations
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
How to take labor charges for construction of 1cum of concrete?
How to calculate the capacity of Water tank?
What are the precautions needs during concrete pouring in very hot weather?
What are the different types of pile founations used?
What is the life of reinforcement?
why seismic analysis not done during design of slabs
Difference between overlap and development length of rod. Thanks.