Answer / jayshankar dwivedi

Situation is called honeycombing. Prepare a mix with GP2
and apply on portion

Is This Answer Correct ?    11 Yes 0 No

what is the process of repair the structure in whitch reinforcement is open..

Answer / balamurugan

simply filled with cement mortor in 1:2 ratio in honeicombes without caveges

Is This Answer Correct ?    2 Yes 0 No

what is the process of repair the structure in whitch reinforcement is open..

Answer / nandkishor kabra

repair can be done by guniting(applying cement and sand
mixture with the aid of compressed air )

Is This Answer Correct ?    2 Yes 0 No

what is the process of repair the structure in whitch reinforcement is open..

Answer / sumit

That situation shoe is honeycombing
So he is repaired with a mix of Nitobond & cement & water

If honeycombing is visible in big area then Jacketing
Method Applied (If possible)

Is This Answer Correct ?    2 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

How many cover blocks should be provided for 10 sq.m area?

1 Answers   Asquare,


Define What is passive earth pressure ?

0 Answers  


Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing

1 Answers  


how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

0 Answers   Bhugan Infracon, UltraTech,


12. Have you ever been asked to leave a position?

1 Answers  






what is meant by concrete joints?

1 Answers   NBCC,


what is th consuption of cement , sand in plastering for 15mm thick cm1:4,1:3

1 Answers  


what is normally consolidated clay and over consolidated clay?

1 Answers  


construction workers how much time take one work or qty

0 Answers  


where will u provide construction joint on slab?

4 Answers  


How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?

0 Answers   AIZAZ General Contracting General Maintenance, GK Realtors,


Explain the advantages and disadvantages of using plastic and timber fenders?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)