What is the rate for RMC25 grade concreter in rs/cu mtr? What is the container capacity of RMC transporter in cu mtr?
Answers were Sorted based on User's Feedback
Answer / shashank shekhar
4200-4700 per cum. The amount of concrete in a RMC is 7 cum.
Is This Answer Correct ? | 1 Yes | 4 No |
Answer / shanmukh
m25 : 3000 rs(ultratech) and m30 3900rs
and one vehicle contant ia 5 to 6 mcu depending on vehicle capacity
Is This Answer Correct ? | 0 Yes | 3 No |
sir, how to calculate steel per 1 m2
For plain cement concrete we want use 20mm aggregate are 40mm mm aggregate
what is weight of asphalt concrete
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
what is the difference between GSB & WBM ?
Difference between pre-tensioning and post-tensioning.
what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.
where will u provide construction joint on slab?