what is the purpose of laying PCC?
Answers were Sorted based on User's Feedback
Answer / a v pithava
To level the unevenness of ground surface for laying of
reinforcement and protecting it from contact with ground
and placing of structural concrete.
Is This Answer Correct ? | 76 Yes | 8 No |
Answer / arun parashar
To level the unevenness of ground surface for laying of
reinforcement and protecting it from contact with ground,
it also improve firm base to foundation increase bearing
capacity of soil.
for any answer releted to civil engineering contact me at
arunparashar007@gmail.com
Is This Answer Correct ? | 32 Yes | 0 No |
Answer / mohammed essam
its maily for level purpose, what ever may be the depth of pit for each column, we shd try to maintain all PCC top levels same, so as to column heights r equal and the loads from them shd evenly be distributed to the surface.
Is This Answer Correct ? | 18 Yes | 0 No |
Answer / anil kumar b s
PCC is the base layer of a Structure which will avoid
direct contact of reinforcement to the earth and avoid the
water content seepage to the structural member.
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / himanshu
it is fly-ash based cement and
provides moisture barrier to
main structure from ground
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / vijay
PCC is just for providing the leveled surface to the
foundation where ground level is uneven and its also
provide extra thickness to the foundation and avoid contact
of water with reinforcement.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sakthi
THIS IS THE FINAL BASE COARSE OF TOTAL STRUCTURE,AND
TRANSFERS THE LOAD UNIFORMLY TO THE GROUND FROM THE ABOVE
STRUCTURE.
Is This Answer Correct ? | 6 Yes | 6 No |
Answer / vidyasagar
its a leveling course and to avoid the contact with soil
from corrosion matter.
Is This Answer Correct ? | 0 Yes | 0 No |
How to calculate the quantity of cement in Cement Mortar M10 Concrete using 40mm metal
how many 10mm steel are needed in 99sqft room
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
What is cold joint, what will happen due to cold joint?
How many feet are in 4 square yards?
why hanger rods are used in beam
can you give me the details of rate analysis of steel and concrete?
what IS Code used for TOR & TMT steel bar
6 Answers L&T, Lokhandwala Construction,
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
what is minimum steel area required for rcc slab
How is calculate the cube molt
Using 1 lit paint how many sq.ft of wall we can paint. Thanks.