Answer Posted / mohammed essam
its maily for level purpose, what ever may be the depth of pit for each column, we shd try to maintain all PCC top levels same, so as to column heights r equal and the loads from them shd evenly be distributed to the surface.
| Is This Answer Correct ? | 18 Yes | 0 No |
Post New Answer View All Answers
what is moment-curvature relationship in semi rigid connections??
Define What is rigging?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
how many digree of freedom in four bar chain
Which stone is best for wall construction Laterite Stone or Cement Blocks
how to calculate the chair reinforcement length in slabs, footing or anywhere??
Explain what is progress payment?
Soil bearing capacity formula
how to calculate reinforcment in staircase cranked beam?
Why are steel plates inserted inside bearings in elastomeric bearings?
at what pressure ply-wood is obtained by gluing wooden sheets
can any one explain bar bending schedule of bems and columns and slabs ??
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
Does VDF add strength to the flooring apart from preventing water ingress?